News
Apr
7
Posted by Chris Pagel on 07 April 2017 11:00 PM

As per notification http://www.n4status.com/london-global-switch-1-pop-planned-maintenance-7417-2300-0400/

We will be commencing as scheduled at 23:00 – further updates to follow

23:17 During the pre-maintenance preparation we experienced some instabilities with Cogent peering. This may have resulted in some instabilities for destinations reached through Cogent (mostly international prefixes). This occurred for several minutes starting at 23:05.  We are continuing with the pre-maintenance preparation.

01:15 Engineers are continuing with the planned maintenance.

02:00 Maintenance has been completed successfully – we are now performing final checks

02:10 Maintenance window is now closed, if you have any issue’s please raise with us as soon as possible

 

 

 

 


Comments (0)
Post a new comment
 
 
Full Name:
Email:
Comments: